Thursday, 22 September 2016

Manual Testing



1.      Error: An Error is a Mistake.
2.      Bug: During Testing of Application When Testing Team Found Actual Result do not match with the expected result.
3.      Defect: Once Project or Product is Release, then during working by Client or their end user if something wrong identified, it is called defect.
4.      Failure: Once Project or Product is Release and more defects are identified by end users then project is known as failure.
5.      Software Testing: Software Testing is process of executing an application with the intent of finding an error.
6.      CMMI Levels:
i)                    Initial
ii)                  Repeatable
iii)                Defined
iv)                Managed
v)                  Optimized
7.      SDLC : Software Development Life Cycle:
i)                    Requirement Gathering:
-          BD Gets the Projects to the company
-          BD Pass the call to BA
-          BA gathers details of requirement from clients.
-          Requirement can be either functional or non- functional.
-          Functional requirement means core functionality of an application.
-          Nonfunctional requirement means overall behavior of application like performance, usability, security, compatibility.
-          BA Prepares BRD.
-          BA sends the document to development team as well as test.
ii)                  Analysis and Planning
-          Define Scope of the project.
-          Feasibility study of the requirement
-          Analyzing risk factors.
-          Effort estimation
-          Cost estimation
-          Deciding programing language of application
-          Preparing gantt chart.
-          Completing the requirement analysis
-          Delimiting the problem domain
iii)                Design
-          Determining which system component will cover which requirement in the system specification.
-          How these system component will work together.
-          Prepares low level design level designs known as prototype or blue print.
-          Prepare high level designs known as DFD, Flowchart, database architecture, algorithms.
-          Description of the Logical data model.
iv)                Development
-          Refining the algorithms for the individual components.
-          Transferring the algorithms into programing languages.
-          Translating the logical data model into a physical one.
-          Compiling and checking the syntactical correctness of the code.
-          Development team starts writing code according to the design prepared by designing team.
v)                  Testing
-          Testing the manual effects of system components under conditions close to reality.
-          Detecting as many errors as possible in the software system.
-          Assuring that the system implementation fulfills the system specification.
-          Perform function and non-function testing against requirement.
vi)                Deployment
-          Product move to production environment for acceptance testing
-          Mainly done by client and their end user
-          Main goal is to check the business flow of the application
-          Correcting errors that are detected during actual operation
vii)              Release
-          Application is published for their end user general public
-          Code is being sent to the website owner.
-          Handover of different document or deliverables to the company.

8.      STLC Life Cycle(Software Testing Life Cycle)
i)                    Requirement Analysis
-          Analysis client requirement in details
-          Deciding testing priorities
-          Checking up automation feasibilities
ii)                  Test Planning
-          Preparation of Test Plan
-          Selection of Testing tools
-          Test effort estimation
-          Resource planning and determining role and responsibilities
-          Training requirement
-          Staffing requirement
-          Define scope of approach
-          Test deliverables: STP (Software Test Plan Document), Gantt chart of Testing.
iii)                Test Case Preparation & Development
-          Create test data for the test cases
-          Development of test cases
-          Approval of test case document
-          Development of automation testing scripts
-          Test deliverables: Preparation Test data, Test case , Test Script Development
iv)                Test Environment Setup
-          Setting up all hardware component
-          Installation of all required software
-          Installation and configuration of testing tools
-          Copying required document
v)                  Test Execution & Bug Reporting
-          Execution of test case
-          Bug reporting to bug tracking system
-          Retesting of the bug after fixes
-          Mapping of bugs with the test cases
-          Test deliverables:  Bug Reporting from bug management tool, updating test case document
vi)                Test Cycle Closure:
-          Submitting STR(Software Test result)
-          Submitting test summary report, test plan document,test case/script etc…
-          Sharing experiences with the team.

-           

No comments: